Check out our

figures

Facts &

Bruges

Rediscover the Kerkebeek

The public consultation round has brought a lot of positive feedback from the residents. The city has answered all remarks and questions. The design team is now ready to draw up the final design taking resident feedback into account.

Find us on Social Media

6847

trees planted

6 Swales

for rain water infiltration

3.000

new urban green

space

 m2

16.040

 m2

pavement replaced with permeable surfaces

= almost 2,5 soccer fields

63.700

residents participated in pilot engagement activities

48.200

 m3

Rain water buffer capacity added

= about 19 Olympic size swimming pools

256 officers

from 133 local authorities attended the workshops